Interior walls come down as extension picks up pace

04 October 2025

Interior walls come down as extension picks up pace

The interior walls that formed the kitchen, store cupboard, shower and toilet areas and the home and away dressing rooms have been taken down as the main pavilion extension and refurbishment begins to take shape.

Toilet and shower area 

Looking from the kitchen down through the storage cupboard towards the showers

Home changing room

Away changing room

The front of the kitchen